It's the moment everyone looks forward to and some dread: you receive the keys and discover that the apartment is not the one in the brochure, that the area is smaller, or that the promised pool doesn't exist. Before signing anything, there is a sequence of steps that protects your position. A clarification: I found no verified Dominican case law or regulations on specific deadlines or remedies in these cases, so what follows is a practical method, and your attorney should confirm what rights your contract and the law grant you.
✔ Gather your documents: contract or purchase promise, blueprints, specifications memorandum, amenities list, advertising, and written communications. ✔ Identify what is contractual: what appears in the contract annexes carries more weight than what appeared in a brochure, although advertising can also be relevant. ✔ Make your checklist: finishes (flooring, kitchen, bathrooms, doors, windows, A/C), area (private and common), layout, furniture or equipment included, amenities (pool, gym, green areas, security), and services.
An opinion column by attorney Reyna Echenique (El Inmobiliario, July 2025) warns that some contracts include clauses allowing the developer to modify specifications, finishes, layout, square footage, and amenities. It's an opinion, but it tells you what to look for: if your contract has such a clause, the comparison becomes complicated and your attorney must review it first.
✔ Inspect carefully, preferably with a professional (engineer, architect, or inspector) familiar with the blueprints. ✔ Measure the area and compare it with what was contracted, distinguishing between private area and proportional share of common areas. ✔ Test everything: faucets, drains, electricity, air conditioning, doors, locks, windows, leaks. ✔ Photograph and film each defect with the date. ✔ Write down everything that doesn't match, no matter how minor. ✔ Review the amenities: Are they finished, operational, and accessible? Or are they "under construction" or "coming soon"?
✔ Don't sign off if there are differences. The receipt can be interpreted as acceptance of the unit as is. ✔ If you sign, include written reservations: a list of defects and pending differences with a correction deadline. ✔ Request a signed copy of everything you sign. ✔ Consult your attorney before accepting a standard receipt, especially if delivery is tied to the final payment.
Execution defects: a poorly installed door, a leak, a finish detail. These usually resolve with a correction list. Specification differences: a material different from what was promised. It's debated whether it's equivalent or inferior, and if the contract allows it. Area or layout differences: more serious. They can affect price and require professional measurement. Promised amenities not delivered: depends on whether they appear in the contract, advertising, or just in renderings.
Written claim to the developer, with detailed list, photos, and reference to documents proving what was promised. Request a response with deadline.
Notify the trustee, if the project is in trust and there are still pending funds or procedures.
Propose a concrete solution: repair with deadline, replacement, economic compensation, or price adjustment.
Consult your attorney regarding warranty clauses, penalties, or applicable remedies.
Turn to Proconsumidor if there is no response. According to a note in El Caribe, its director reported that it had resolved more than 500 cases between builders and buyers, with about 90% of resolutions ending in settlement, citing the Constitution (article 53) and Law 358-05 as grounds. This is an institutional statement I could not verify against another source, and the note does not indicate the exact date.
Evaluate judicial action with your attorney if the damage is significant and negotiation fails.
✔ Construction warranty: as we saw in a previous article, responsibility for construction defects has its own regime. Ask what your contract covers beyond what the law requires. ✔ Warranty for finish defects: usually established in the contract; verify deadline and conditions. ✔ Condominium administration obligations over common areas once constituted.
✔ Receiving the unit without formal inspection. ✔ Signing the receipt without reservations. ✔ Claiming only by phone or message, without written record. ✔ Trusting verbal promises of "we'll fix it later." ✔ Not keeping the advertising and renderings used by the seller. ✔ Letting too much time pass without claiming. I don't know what the deadlines are in your case, so check with your attorney.
Prepare the delivery like an audit: contract in hand, checklist, and if possible, a professional to accompany you. What is recorded in writing before you sign is what gives you leverage to claim afterward.
If you want me to help you build your delivery checklist, write to me. I'm Yolanda Landínez and I'm happy to assist you: write to me on WhatsApp.
Informational content, not legal advice. I found no verified Dominican sources on specific deadlines and remedies; the Proconsumidor statements and cited column are opinions or notes not independently verified.